Brookfield R/S CPS Rheometer Manuale Utente Pagina 13

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 62
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 12
BrookeldEngineeringLabs.,Inc. Page13 ManualNo.M08-218-B0212
Peliter Control Cable IN
Peltier Power Supply IN
Drawer G Fuse
5x20 1A (delay)
Main Switch
AC Power Supply
Fig. 4-B: Back View of Peltier Supporting Unit P-TS
The P-TS is powered via a grounded main socket. The AC voltage must be the same as the
rated voltage shown on the plate.
The cables for Peltier control are connected to the related sockets (see Figure 4-B). In
case cooling processes are supported with cooling water (+10°C to +30°C), the rheometer
(Model P1) measuring plate should be connected with appropriate hose connections to the
bath/circulator.
After activation of the main switch, the green LED display illuminates on the P-TS. The
rheometer display shows the control function in the menu directory as “Thermostat”.
The P-TS should be switched off during unsupervised operation
(heating or cooling).
III.3.3 ElectricHeatingControl
The R/S CPS+ Rheometer with electric heating (R/S CPS+ E1) does not need a bath/cir-
culator. Detailed information on this operation is given in a separate manual for electric
heating EHR.
Vedere la pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 61 62

Commenti su questo manuale

Nessun commento